Project scope
Rack layouts, cabling, UPS power, cooling and environmental monitoring requirements.
Suggested handover records
Equipment lists, power and cabling drawings, commissioning records and handover documentation.
Common questions
What is needed for an initial discussion?
Provide the location, intended use, existing equipment and timeline. Drawings and a site survey help refine the requirements.
How is scope and pricing confirmed?
Finalise the scope, material specifications, testing criteria and exclusions after a survey, then record them in the quotation and contract.